Translate

Tuesday, October 6, 2009

Huntingdon, PA House Rehab

Alan is installing new floors after having put in dry wall. He first levels the existing boards, then puts down luan 1/4 " subfloor, and then lays down Ikea laminate flooring (no glue or nails).
You can see the new walls being painted and the new floor below.
Marina, left, and Alan, right, host Claire for breakfast.
The house is surrounded on three sides by a cemetary with great views.





No comments: