Translate

Wednesday, September 30, 2015

Hull Bathroom: Wall Tiling

This series of photos shows the long process of tiling the shower surround, after having built up the walls with 'Hardee Board,' filled cracks and seams and prepared the surface.






Alan manages a smile even with laying over 500 tiles.
Maybe he is just happy to be nearing the end of the laying process.
Then, grout is applied carefully between all those tiles.
At bottom, Alan wipes the haze of grout off of the tiles.






1 comment:

Mark said...

Impressive tile work!