Translate

Tuesday, August 13, 2013

Day 4: Barrage de Moiry (2,200 meters) up




The Barrage de Moiry is one of a number of very large dam systems that Switzerland has built in upper alpine valleys, to produce electricity and reduce flooding.  This dam was built in 1958 after 4 years of construction by 1,200 workers.

The view above shows the path ascending the slope, after crossing the dam.

The alp plateau was formed by a glacial end moraine.  The lake is visible in the photos, along with the Moiry glacier, receding in the background.

No comments: